MHSC CFX24 Operations Instructions Page 19

  • Download
  • Add to my manuals
  • Print
  • Page
    / 32
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 18
19
CFX Vent Free Fireplace System
20301726
LOG PLACEMENT
Before you begin This unit is supplied with a set of three ceramic ber logs. Do not handle these
logs with your bare hands. Always wear gloves to prevent skin irritation from ceramic bers. After
handling logs, wash your hands gently with soap and water to remove any traces of bers.
PROPER INSTALLATION SEQUENCE
(CFX24)
Figure 17
1. Install the rear log (#3) on back of burner.
2. Install the right log (#1) on burner pins on right side of
burner.
3. Install the left log (#2) on burner pins on left side of
burner.
LG588
CFX24 logs
Figure 17 -
Log Placement CFX24
Rear Log
#3
Left Log
#2
Right Log #1
Burner Pins
Burner
Pins
LG588
WARNING
The positioning of the logs is critical to
the safe and clean operation of this heater.
Sooting and other problems may result if the
logs are not properly and rmly positioned
in the appliance. Never add additional logs
or embellishments such as pine cones,
vermiculite or rock wool to the heater.
WARNING
Failure to position the parts in accordance
with these diagrams or failure to use only
parts specically approved with this heater
may result in property damage or personal
injury.
CAUTION
DO NOT sprinkle volcanic rock on the logs
or around the pilot or the main burner. This
may cause sooting. Only place volcanic
rock on the oor of the replace.
During initial operation of the new heater,
burning logs will give off a paper burning
smell and orange ames will be present.
Simply open the windows for a few hours
to vent the odor.
Page view 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 31 32

Comments to this Manuals

No comments